




๐ Elevate Your Entertainment Experience!
The Finesse Cables 10M HDMI Cable v1.4 is a high-speed, long lead cable designed for optimal audio-visual performance. With gold-plated connectors, it supports resolutions up to 1080p at 60Hz and is compatible with a wide range of devices including gaming consoles, TVs, and projectors. Its durable design ensures longevity, while features like Ethernet and ARC support enhance your home cinema experience.


| ASIN | B07GZR5YX7 |
| Best Sellers Rank | 1,760 in HDMI Cables |
| Brand | Finesse Cables |
| Cable Type | HDMI |
| Colour | Black |
| Compatible Devices | TV, Playstation, Xbox, DVD, CCTV, Sky TV, Cable, PC, Laptop, projector, home cinema, AV |
| Compatible Phone Models | No Compatible Phone Models |
| Connectivity Technology | HDMI |
| Connector Gender | Male-to-Male |
| Connector Type | HDMI |
| Customer Package Type | sealed anti-static bag |
| Customer Reviews | 4.5 4.5 out of 5 stars (914) |
| Data Transfer Rate | 18 Gigabits Per Second |
| Ethernet Cable Category | Cat 5e |
| Frequency | 60 Hz |
| Indoor Outdoor Usage | Indoor |
| Item Length | 10 Metres |
| Item Shape | Round |
| Item Weight | 500 Grams |
| Manufacturer | Finesse Goods |
| Manufacturer Part Number | HDMI |
| Model Name | HDMI V1.4 |
| Model Number | HDMI V1.4 |
| Number of Items | 100 |
| Number of Pins | 19 |
| Other Special Features of the Product | Low Voltage |
| Outer Material | [Predicted] PVC |
| Recommended Uses For Product | Connecting DVD players, games consoles, projectors, cable & satellite boxes to TV screen. PC and Laptops to monitors |
| Specification Met | hdmi |
| UPC | 604565186294 |
| Unit Count | 1.0 count |
Trustpilot
1 week ago
1 month ago