---
product_id: 41559661
title: "BWSC Dog Harness And Long Lead Set Skull For Chihuahua Doggie Puppy Black Colour (XS)"
brand: "bwsc"
price: "¥5060"
currency: JPY
in_stock: true
category: "Misc."
url: https://www.desertcart.jp/products/41559661-bwsc-dog-harness-and-long-lead-set-skull-for-chihuahua
store_origin: JP
region: Japan
---

# BWSC Dog Harness And Long Lead Set Skull For Chihuahua Doggie Puppy Black Colour (XS)

**Brand:** bwsc
**Price:** ¥5060
**Availability:** ✅ In Stock

## Quick Answers

- **What is this?** BWSC Dog Harness And Long Lead Set Skull For Chihuahua Doggie Puppy Black Colour (XS) by bwsc
- **How much does it cost?** ¥5060 with free shipping
- **Is it available?** Yes, in stock and ready to ship
- **Where can I buy it?** [www.desertcart.jp](https://www.desertcart.jp/products/41559661-bwsc-dog-harness-and-long-lead-set-skull-for-chihuahua)

## Best For

- bwsc enthusiasts

## Why This Product

- Trusted bwsc brand quality
- Free international shipping included
- Worldwide delivery with tracking
- 15-day hassle-free returns

## Description

Size Guide:  Size *** A - Neck (inch) *** E - Back (inch) *** B - Breast Girth (inch) *** General Breed Reference  1 XXS ** 7 ~ 8.6 *********** 7 ~ 8.6 ********** 11 ~ 12.6 ************* Chihuahua, Mini Doberman 2 XS *** 7.9 ~ 9.5 ********** 8.7 ~ 10.2******* 14.2~15.7 ************* Yorkshire Terrier, Pomeranian  3 S **** 9.4 ~ 11 ********** 10.6 ~ 12.2 ****** 15.8 ~ 17.3 ************ Toy Poodle, Maltese  *****PLEASE NOTE THAT AS SHOWN IN THE TABLE ABOVE THE DOG BREEDS ARE ONLY A GENERAL REFERENCE. PLEASE MEASURE YOUR DOG CAREFULLY TO ENSURE CORRECT FITTING*****

## Features

- 100% brand new and high quality
- Adjustable Clip On The Back Of The Harness That Lets You Tighten Or Loosen As Required
- Including dog lead
- Colour: Black and White
- Pretty comfortable dog harness and lead set

## Images

![BWSC Dog Harness And Long Lead Set Skull For Chihuahua Doggie Puppy Black Colour (XS) - Image 1](https://images-na.ssl-images-amazon.com/images/I/61wygdMvvDL.jpg)
![BWSC Dog Harness And Long Lead Set Skull For Chihuahua Doggie Puppy Black Colour (XS) - Image 2](https://images-na.ssl-images-amazon.com/images/I/61kGMEXx4mL.jpg)
![BWSC Dog Harness And Long Lead Set Skull For Chihuahua Doggie Puppy Black Colour (XS) - Image 3](https://images-na.ssl-images-amazon.com/images/I/61VC-fpfHfL.jpg)
![BWSC Dog Harness And Long Lead Set Skull For Chihuahua Doggie Puppy Black Colour (XS) - Image 4](https://images-na.ssl-images-amazon.com/images/I/61PrlvrcW1L.jpg)
![BWSC Dog Harness And Long Lead Set Skull For Chihuahua Doggie Puppy Black Colour (XS) - Image 5](https://images-na.ssl-images-amazon.com/images/I/41ZxJWWFyGL.jpg)

---

## Why Shop on Desertcart?

- 🛒 **Trusted by 1.3+ Million Shoppers** — Serving international shoppers since 2016
- 🌍 **Shop Globally** — Access 737+ million products across 21 categories
- 💰 **No Hidden Fees** — All customs, duties, and taxes included in the price
- 🔄 **15-Day Free Returns** — Hassle-free returns (30 days for PRO members)
- 🔒 **Secure Payments** — Trusted payment options with buyer protection
- ⭐ **TrustPilot Rated 4.5/5** — Based on 8,000+ happy customer reviews

**Shop now:** [https://www.desertcart.jp/products/41559661-bwsc-dog-harness-and-long-lead-set-skull-for-chihuahua](https://www.desertcart.jp/products/41559661-bwsc-dog-harness-and-long-lead-set-skull-for-chihuahua)

---

*Product available on Desertcart Japan*
*Store origin: JP*
*Last updated: 2026-10-10*